Public Works

The Public Works Department is responsible for maintaining the infrastructure of the Town of Englehart.

Public Works Superintendent Ryan Vickery should be contacted at 544-2288 in the case of a water or sewer emergency.

The Public Works Department has a few reminders for the residents of Englehart.


Quality Management System Policy 


The Town of Englehart is committed to maintaining and continually improving on the Quality Management System, providing safe drinking water to consumers, and complying with applicable legislation and regulations.


Garbage


Residents are reminded to put the orange garbage stickers on all garbage put out for pickup. Any garbage without these stickers will be left. Residents should remove the garbage from the curb until the next pickup day.
All waste should be placed at the curb for pickup before 8 a.m. NOT the night before. Garbage is an attraction for bears which is becoming a significant problem so please be bear wise and do not leave your garbage outside overnight! 

Thank you for your cooperation in this matter.


Public Works Notices


OCTOBER 17, 2017

THE CORPORATION OF THE TOWN OF ENGLEHART
PUBLIC NOTICE
WATER LINE FLUSHING

THE PUBLIC WORKS DEPARTMENT OF THE TOWN OF ENGLEHART WILL BE PERFORMING WATER MAIN FLUSHING STARTING TUESDAY OCTOBER 17 TO FRIDAY OCTOBER 20, 2017. FLUSHING WILL TAKE PLACE FROM 8AM TO 4PM DAILY. IF WATER IS DISCOLOURED PLEASE LET IT RUN UNTIL CLEAR. 
THANK YOU FOR YOUR CO-OPERATION. THE PUBLIC WORKS DEPARTMENT APOLOGIZES FOR ANY INCONVENIENCE THIS MAY CAUSE.

RYAN VICKERY
SUPERINTENDENT
TOWN OF ENGLEHART 
WORKS DEPARTMENT

 

SEPTEMBER 18,2017

Please be advised that the boil advisory for residents north of the railway tracks on First Street has been lifted.

No automatic alt text available.

SEPTEMBER 14, 2017

Please be advised that the water supply for all residents north of the tracks on first street will be shut off at 8:30am, Thursday September 14, 2017. This is to allow for the replacement of valves and to hook up new water lines. Your water service will be back on as soon as possible. However, the interruption of water service could continue till 4:30pm. Please remember that the boil water advisory remains in effect until further notice. We apologize for any inconvenience this may cause.

Town of Englehart Works Department

SEPTEMBER 7, 2017

The Town Works Department would like to advise all residents north of the tracks on First Street that the water will be shut off on Friday September 8 for valve replacement and connecting new main instead of today due to excessive rain fall. The boil advisory is still in effect.

 

September 7 2017 WATER SHUT OFF

Please be advised that your water will be shut off at 9:00 am, Thursday September 7, 2017. This is to allow for the replacement of valves and to hook up new lines.

Your water service will be back on as soon as possible, although some may be without water until 4:30 p,/

We are sorry for any inconvenience this may cause.

Town of Englehart

 

May 24 & 25 2017 WATER LINE FLUSHING

PLEASE BE ADVISED WATER MAIN FLUSHING MAY 24th & 25th. FLUSHING WILL TAKE PLACE FROM 8:00AM TO 4:30PM DAILY.

IF WATER IS DISCOLOURED PLEASE LET IT RUN UNTIL CLEAR.
THANK YOU FOR YOUR CO-OPERATION. THE PUBLIC WORKS DEPARTMENT APOLOGIZES FOR ANY INCONVENIENCE THIS MAY CAUSE.

 

2017 Annual Spring Clean-up Notice

Curbside pick-up will be held on May 23, 2017. All household garbage MUST be tagged for regular pickup.

Tipping fees will be waived at the landfill site on Tues, May 23 and Sat, May 27,

There will be NO repeat pick-up; your debris will be picked up once between 8:00 AM to 4:30 PM.

Residents are asked to separate garbage/debris into three piles; tagged household garbage, wood and metal.

Branches are to be no longer than 4 feet in length.

There will be a maximum allowance of the equivalent of 1 pickup truck per household.

PLEASE PUT YOUR DEBRIS OUT THE DAY PRIOR TO THE PICK-UP DATE.

PLEASE NOTE: Rubber tires and refrigerators or freezers WILL NOT be picked up. Refrigerators, Freezers and any Freon appliance can be taken to the landfill site FREE of charge as long as they are properly tagged by an individual qualified to remove Freon from appliances

Residents are reminded that ALL household garbage during and after these dates MUST be tagged according to normal procedures.

Residents are encouraged to also put any electronics i.e. Televisions, computers, and any other small electronics for recycling, at the curb.

The Works Department wishes to thank all residents in advance for your cooperation in this matter. Collection may take more than one day so your patience is appreciated.

Residents are encouraged to contact the Works department at 544-2288 for more information.

 

2017 GOOD FRIDAY GARBAGE NOTICE

The Town of Englehart Public Works Department would like to advise Englehart residents that garbage and recycling pick up regularly scheduled for Friday April 14th has been re-scheduled for Thursday April 13th due to the Good Friday Holiday. Just a reminder to have your garbage and recycling at roadside by 8:00 am on that day. Thank you and have a great weekend!

 

2017 CHRISTMAS GARBAGE, RECYCLING & LANDFILL SCHEDULE

  • Wednesday Dec. 27 - (replacing Tuesday Dec. 26 garbage pick up)
  • Friday Dec. 29 - (pick-up as usual)
  • Landfill hours - Wednesday Dec. 27 & Saturday Dec. 30 - (9 am-5 pm)

 

2016 ANNUAL FALL CLEAN-UP NOTICE 

Pick-up will be done throughout the town of Englehart on the following date:  Tuesday November 1, 2016 for yard debris. Public Works will be making ONE trip through town. The Public Works Department asks that you have your 4' LENGTH BUNDLED BRANCHES, BAGGED LEAVES, BAGGED GRASS, CLIPPINGS AND BAGGED GARDEN DEBRIS IN CLEAR BAGS ONLY at curb side on the above date. For household garbage, regular pick-up procedures still apply. Tipping fees will be waived at the landfill site on Tuesday, November 1st and Saturday, November 5th, 2016 for all Englehart residents excluding contractors.

The Works Department wishes to thank you in advance for your cooperation.

 

WATER AND SEWER PROJECT 2015-16

Please be advised that the water and sewer project for 2015-16 should be completed by November 30, 2016. The material used to backfill the road construction requires the winter to settle before paving can take place. Paving of all affected roads will be completed in early 2017 as soon as the weather permits. The Public Works Department apologizes for any inconvenience this may cause. 

RYAN VICKERY, SUPERINTENDENT.  TOWN OF ENGLEHART WORKS DEPARTMENT

 

    Maps  |  News  |  Contact Us  |  Facebook Logo

    Powered by CivicWeb CMS - © Copyright 2013 iCompass Technologies Inc.